> ## Documentation Index
> Fetch the complete documentation index at: https://dpos.isoc.ooo/llms.txt
> Use this file to discover all available pages before exploring further.

# DP Offline Ubuntu Upgrade Guide

> Follow one ordered runbook to prepare the Mirror Server, upgrade DP nodes to Ubuntu 24.04, complete DP 6.6.0 bringup, and validate the system.

Stellar Cyber DP lifecycle

# Upgrade DP infrastructure with a controlled, repeatable path.

Prepare an offline Mirror Server, move supported DP nodes from Ubuntu 16.04 to 24.04, complete DP 6.6.0 Phase 2, and validate every gate before the next step.

[Start the work plan →](https://dpos.isoc.ooo/runbook/work-plan.md)
[Check requirements](https://dpos.isoc.ooo/getting-started/requirements.md)

**Prepare**Stage and validate release material before the maintenance window.**Upgrade**Follow one ordered OS-hop and Phase 2 procedure with current commands.**Validate**Use explicit readiness, health, and recovery gates before closure.

> [!TIP]
>
> **First time here?** Start with **[1. Upgrade Work Plan](https://dpos.isoc.ooo/runbook/work-plan.md)**, then follow the numbered pages in the left navigation from top to bottom.

## The complete flow

```text theme={null}
Plan the work
  → Build / verify Ubuntu 24.04 Mirror Server
  → Prepare upgrade files and reach READINESS = PASS
  → DP Ubuntu 16.04 → 18.04 → 20.04 → 22.04 → 24.04
  → DP 6.6.0 Phase 2 bringup
  → Final validation and approved snapshot cleanup
```

The Mirror Server downloads and validates the required files in advance. During the production upgrade, DP hosts retrieve prepared material from that server over **HTTP/TCP 80**.

## Follow these five steps

> [card] [1. Upgrade Work Plan](https://dpos.isoc.ooo/runbook/work-plan.md)
>
> Confirm the upgrade path, maintenance sequence, snapshots, cluster order, and go/no-go gates before touching any DP.

> [card] [2. Ubuntu 24.04 Server Installation](https://dpos.isoc.ooo/runbook/ubuntu-24-04-server-installation.md)
>
> Build the Mirror Server when a new server is required, then verify disk, network, and SSH access.

> [card] [3. Mirror Server Setup](https://dpos.isoc.ooo/runbook/mirror-server-setup.md)
>
> Install Mirror Manager, prepare the files, enable HTTP distribution, and reach **Upgrade Readiness = PASS**.

> [card] [4. DP Offline Ubuntu Upgrade](https://dpos.isoc.ooo/runbook/offline-dp-upgrade.md)
>
> Use fresh Menu 7 commands for every OS hop and for DP 6.6.0 Phase 2 bringup.

> [card] [5. Post-Upgrade Validation](https://dpos.isoc.ooo/runbook/post-upgrade-validation.md)
>
> Verify Ubuntu, DP version, DL/DA readiness, services, NTP/DNS, application health, and recovery-snapshot cleanup criteria.

> [!WARNING]
>
> Do not begin DP-side work until the current Mirror Server configuration reports **Upgrade Readiness = PASS** and fresh Menu 7 commands have been generated.

## Overall work plan

The following example shows the complete flow for a **3-node DL cluster + 3-node DA cluster**. Smaller deployments follow the same stage order; use the current Menu 7 output for the exact commands and node-specific procedure.

![DP Ubuntu 24.04 offline upgrade work plan](https://mintcdn.com/dpos/2ldpAgSjUMePfiaJ/images/google-sites/01-work-plan/1.png?fit=max\&auto=format\&n=2ldpAgSjUMePfiaJ\&q=85\&s=414af6f96c86687465393e28be3cd614)

Example end-to-end maintenance flow for a 6-node DP deployment

## Which path applies to my DP?

| Current state | Use | Result |
| - | - | - |
| Supported DP 6.2.x–6.5.0 on Ubuntu 16.04 | **Full OS Upgrade + Phase 2** | Ubuntu 24.04 + DP 6.6.0 |
| Supported DP 6.2–6.5 already on Ubuntu 24.04 | **Phase 2 Only** | DP 6.6.0 |
| Healthy DP 6.6.0 on Ubuntu 24.04 | Normally no upgrade | No change |

The current Mirror Manager target is **DP 6.6.0**. Historical screenshots or recordings may show 6.5.0; do not copy those release-specific commands into the active workflow.

## Three rules to remember

1. **Prepare first.** Complete the Mirror Server work before the production maintenance window whenever possible.
2. **Use freshly generated commands.** Run Menu 7 and use the commands it generates for the current Mirror Server IP, mode, and cluster configuration.
3. **Keep recovery available.** Create the required hypervisor snapshot(s), follow any additional powered-off snapshot gate printed by the current upgrade client, and keep recovery points until final validation and change-control closure.

## If something does not match the guide

Use **[Troubleshooting](https://dpos.isoc.ooo/operations/troubleshooting.md)** for the failed layer, **[Retry & Recovery](https://dpos.isoc.ooo/operations/retry-recovery.md)** for interrupted operations or Phase 1 state, and **[Video Guides](https://dpos.isoc.ooo/video-guides.md)** for supplemental visual references. Lower-level implementation material is separated into the **Reference** tab so the numbered runbook remains the primary operator path.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.